You are viewing the site in preview mode
Skip to main content
|
Primary outcome measure:
|
|
• Physical function of injured upper limb at 4 weeks (28 ± 3 days), as determined by the PROMIS tool.
|
|
Secondary outcome measures:
|
|
• Direct and indirect health care costs (healthcare provider visits, days off work/school)
|
|
• Health related quality of life (QOL), as determined by the CHU9D
|
|
• Satisfaction score (patient and parent)
|
|
• Patient pain score measured using the FPSR
|
|
• Rates of complications (alternate fracture diagnosed, poor fracture healing)
|
|
• Rates of x-ray and other imaging (particularly the ‘no’ and ‘buckle’ fracture groups)
|
|
• ED length of stay (triage to ED discharge)
|
|
• Treatment time (clinician review to ED discharge)
|
|
• Diagnostic accuracy of POCUS, including secondary signs, and x-ray
|
- Key: PROMIS Pediatric Upper Extremity Short Patient-Reported Outcomes Measurement Information System, CHU9D Child Health Utility 9D, FPSR Faces Pain Score Revised